StinsonHole

The Stinson Municipal Airport Control Tower is officially under construction. I can't say it's "out of the ground" yet as it's still technically a hole in the ground. But it's getting there.

For the record it's been almost two years HiWorks along with Work5hop designed the winning submission for the competition to propose "design improvements" to the original tower design by AJT Engineering. Architecture is not career for those desiring instant gratification.

At any rate, the "wings" of our design are being manufactured by International Tensile Structures in Phoenix, Arizona and we'll be making a trip out there this fall to see how work on those structures is proceeding. The tower itself is scheduled to be operational next year.